Page 36 / 54 Scroll up to view Page 31 - 35
36
Figure 2: GigaCenter Slid partway and 5mm Pigtail Attached
Figure 3: GigaCenter Fully Mated with Fiber Management Tray
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.
Page 37 / 54
Chapter 3
UPS Installation
Mounting the Universal Power Supply
Prior to putting the GigaCenter into service, the UPS must be mounted to ensure the low
voltage power cord that is connected between the UPS and the GigaCenter is long enough to
span the distance between the two devices.
Depending on your configuration, power cords of varying lengths may be included:
The AC power cord that runs from the UPS to the AC wall outlet is 8-feet long. Make
sure an AC outlet is available within that distance.
The power/signal cord that runs from the UPS to the GigaCenter is available in any of
the following configurations based on model.
844G-1/854G-1 (North American Markets), Sold Separately
Connectorized Power and Signal Cable - An 8-pin (GigaCenter end) to 7-pin terminal
block (UPS end) cable available in 3 foot (1 meter) or 10 foot (3 meters) lengths.
Connectorized Power and Signal Cable - An 8-pin (GigaCenter end) to dressed and
tinned (un-terminated) cable available in 20 foot (6 meter) length.
Power Adapter, 2-prong Type A - An 8-pin (GigaCenter end) to standard North
American 2-prong electrical outlet (how long?)
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.
Page 38 / 54
38
844G-2/854G-2 (International Markets), Sold Separately
Power Adapter, EU Type C
Power Adapter, AM Type A
Power Adapter, UK Type G
Power Adapter, AU/NZ Type 1
Power Adapter, AR Type 1
Mounting the UPS
WARNING!
High voltage electrical and pressurized natural gas lines may be
present. Make sure you fully understand the locations of these and all other utility
connections before drilling through any surface.
CAUTION!
The UPS is designed for indoor installation and must be installed in a
location with adequate airflow.
Make sure the UPS is not installed under water pipes which may leak or drip from
condensation.
Note:
The UPS must be located less than 50 feet (15.2 meters) from the GigaCenter when
using an 18 AWG Type I power cord or less than 70 feet (21.3 meters) from the GigaCenter
when using 16 AWG Type II power cord.
1.
Unpack the UPS and associated hardware from the carton.
2.
Find a suitable location for the UPS and prepare mounting screws per the mounting hole
pattern shown below.
Note:
Refer to the back of this guide for a UPS mounting template.
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.
Page 39 / 54
39
1.
Pre-drill mounting holes (to accept an 8-32 pan head screw - not provided) of the
appropriate size.
Important:
Make sure the material you are mounting the UPS to is of sufficient strength
to support its weight of 7.16 pounds (3.25 kgs).
2.
Insert a screw into each hole, leaving 3/16-inch (.48 cm) of the screw protruding from
the wall.
3.
Align the key slots on the top of the UPS with the screws and slide the unit down into
place.
4.
If the UPS is not snug after test fitting the mounting screws, remove the UPS and tighten
the mounting screws slightly to allow for a tighter fit.
5.
Unpack the battery and slide it into the UPS housing.
6.
Attach the battery leads to the battery (red to red, black to black).
7.
Re-install the battery cover.
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.
Page 40 / 54
40
Installing the Power/Signal Cable
The cable providing power and alarm signaling from the UPS to the GigaCenter is pre-wired
and ready for plug-and-play use. This pre-wired power/signal cable is available in 3 foot (1
meter) or 10 foot (3 meter) lengths.
Note:
A 20 foot (6 meters) cord is also available including a (2 x 4) 8-pin connector on the
GigaCenter end and dressed and tinned non-terminated 7-wire on the opposite end (provides
"cut to length" option).
To connect the power/signal cable
1.
Locate the power and alarm cable and remove any cable ties.
2.
Plug one end into the UPS and plug the other end into the GigaCenter ([2 x 4] 8-pin
connector).
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© Calix. All Rights Reserved.

Rate

4.5 / 5 based on 2 votes.

Popular Calix Models

Bookmark Our Site

Press Ctrl + D to add this site to your favorites!

Share
Top