BreezeMAX PRO 6000
Product Manual
Chapter 2 - Installation
Connecting the ODU Cables
16
5
Tighten the gland nut. Use the dedicated tool for fastening the sealing glands.
6
Attach the mastic tape (Scotchfil™ Electrical Insulation Putty) and wrap it around the connector
butting up against the connector. Do not over stretch.
7
Squeeze to tighten the mastic sealer. Make sure there are no air bubbles.
8
Slide the cold shrink sleeve on top of the connector. Make sure that the sleeve covers both cable
connector and unit connector.
9
Pull the cord slowly to shrink the sleeve.
10
Route the cable to the location selected for the indoor equipment.
11
Assemble an RJ-45 connector with a protective cover on the indoor end of the IDU-ODU cable. Refer
to the pin assignment and color codes in standard cables described above.
2.3.4
Installing the Power Injector IDU
The unit can be placed on a desktop or a shelf, or it may be wall-mounted.
Figure 2-7: Sealing Gland Fastening Tool
Figure 2-8: Cold Shrink Tubing
Cold Shrink Seal
Cold Shrink Sleeve
Cord
Page 32 / 138
BreezeMAX PRO 6000
Product Manual
Chapter 2 - Installation
Connecting the ODU Cables
17
1
It is assumed that the IDU-ODU cable is already connected to the ODU. Assemble an RJ-45 connector
with a protective cover on the indoor end of the IDU-ODU cable. Refer to
Section 2.3.3
for
instructions on preparing the cable.
2
Connect the IDU-ODU cable to the single port, labled “TO/FROM ODU PoE (RJ45)” (
Figure 2-9
).
3
Connect one end of the supplied Ethernet cable to a PC/Hub/Switch.
4
Connect the other end of the Ethernet cable to the RJ-45 IDU port, labled with a computer illustration
(see
Figure 2-10
).
5
Use a telephone cable to connect a phone to the RJ-11 IDU port labled with a telephone illustration
(see
Figure 2-10
).
6
Connect the indoor unit to the AC mains using the power cable supplied with the unit.
INFORMATION
The length of the Ethernet cable connecting CPE to the user's equipment, together with the length of
the IDU-ODU cable, should not exceed 100 meters.
To install and connect the Power Injector IDU:
Figure 2-9: IDU-ODU PoE port (“TO/FROM ODU PoE (RJ45)”)
Page 33 / 138
BreezeMAX PRO 6000
Product Manual
Chapter 2 - Installation
Connecting the ODU Cables
18
Figure 2-10: Data Equipment and Telephone Ports
CAUTION
Do
not
connect the data equipment to the PoE port on the IDU, as it supplies DC power to the ODU,
and this may harm other equipment connected to it.
To
PC/Hub/Switch
(RJ-45)
To Phone
(RJ-11)
Page 34 / 138
BreezeMAX PRO 6000
Product Manual
Chapter 2 - Installation
Checking for Proper Operation
19
2.4
Checking for Proper Operation
1
Verify data connectivity by sending a ping command to the BTS or by connecting to the Internet.
2
Check the LED functionality according to the following table:
Table 2-2: LED Functionality
Description
Color
Functionality
Fault + Eth indication LED
Red
Lights at start up
During the built-in test (BIT) blinks (300ms on,
300ms off).
Off/On - If BIT finished successfully. If BIT is
failed it will continue lightning.
On - If fatal error/critical alarm appears during
run time.
Blinking - If PoE Eth connected and no errors
found (1sec on, 3sec off).
WiMax W/L link availability
LED
Green
Lights at start up
Off - upon BIT completion
Blinking - the CPE is synchronized to the BS
and
5>SNR
3dB.
On - when the CPE is synchronized to the BS
and the SNR
5dB
3 x WiMax link signal
strength LEDs
Green
Lights at start up.
Off - upon BIT completion
Signal strength display:
LED1
blinks when 12>SNR
8dB
LED1
lights when SNR
12dB
LED2
blinks when 18>SNR
15dB
LED 2 lights when SNR
18dB
LED3 (right side) blinks when 25>SNR
20dB
LED3 (right side) lights when SNR
25dB
Page 35 / 138
BreezeMAX PRO 6000
Product Manual
Chapter 2 - Installation
Checking for Proper Operation
20
Figure 2-11: LEDs
Fault + Eth indication (red)
3 x WiMax link signal
strength (green)
WiMax W/L link
availability (green)