ONT G-25E Hardware Installation Manual
3.6
Verify the Installation
Check LED states to verify ONT status (Section 3.6.1).
Services are not available until the ONT is ranged and provisioned in the PON network. If
services must be verified at the time of installation, refer to Section 3.6.2 for additional
instructions.
3.6.1
Verifying ONT Status
Once the ONT installation is complete, follow the procedure below for verifying ONT status.
Figures below show the typical status LED display after the ONT boot sequence is complete.
Figure 6 ONT has not yet been provisioned
Figure 7 ONT has already been provisioned
• Verify that the POWER LED lights green indicating that local power level is good.
• Verify that the OPTICAL LED lights green indicating that the ONT is operating normally.
-
If the ONT has already been provisioned in the network, the OPTICAL LED lights green after
the ONT boot sequence and PON ranging process is complete (approximately 1 minute after
power up). During that ranging process, the OPTICAL LED flashes continually.
The ONT is placed into service remotely through the OLT. Services to the ONT are likewise
provisioned and turned up remotely through the PON network.
• If the OPTICAL LED lights green, indicating that the ONT is communicating with the PON
network, no further activation is necessary and you can proceed to Section 3.6.2: Verifying
Services.
• If the OPTICAL LED does not light green, contact the NOC
(Network Operation Center)
to
activate the line. You may be required to provide or confirm the following information about the
ONT: vendor, model number, serial number. Once the ONT has been activated in the network,
and the OPTICAL LED lights green, you can proceed to Section 3.6.2: Verifying Services.
313-12201-02 Rev. B: August 2007
Cambridge Industries Group Co. Ltd
9